This video case study digs into the scientific analysis of the URETEK Deep Injection process in wet soils under asphalt. This specific location was an active road construction project that was held up due to weakened subgrade soils.
Check out how MoDOT tested the subgrade to determine the degree to which URETEK USA was able to improve their subgrade soils without excavation.
Comments